Using Polybed protects the environment,
saves time and money
reduces your carbon footprint:
- manufactured using 100% recycled materials
- eliminates the need for quarrying and transportation of aggregate – 1 x 3m length of Polybed equates to a quarter tonne of gravel
- reduces site traffic – 1 truckload of Polybed is equivalent to 8 trucks of gravel
- minimises the need for soil cart-away
convenient and easy to handle:
- lightweight and flexible
- supplied in pre-assembled units, easily joined with a rapid click fit connection
- requires no specialist skills
- ideal for use in restricted areas
- ease of installation reduces Health and Safety risks
cost-effective:
- up to 4 times quicker to install
- requires less labour and plant
- reduces transportation costs
- minimises stone and gravel usage
delivers quality performance:
- controlled infiltration
- consistent void ratio in excess of 30%
- high flow capacity
The Polybed Drainage System offers a sustainable high-performance alternative to traditional methods
